A registered erector or supervisor of temporary structures is responsible for undertaking or supervising the erection, maintenance and dismantling of particular types of temporary structures, including prescribed temporary structures. A prescribed temporary structure is one that does not form part of any other building other than a temporary structure or temporary building, and that falls within the following classes of temporary structure:
tents, marquees or booths with a floor area greater than 100 m2
seating stands for more than 20 people
stages or platforms (including sky borders and stage wings) more than 150 m2 in floor area
pre‐fabricated buildings exceeding 100 m2 other than ones placed directly on the ground surface.
Temporary structures are typically installed at public events such as circuses, horse race meetings, concerts and festivals. The structures must be designed according to engineering principles so that they are structurally safe, and safe for the public and other users. For this reason, they must be erected according to design specifications that allow safe access and egress of all people (including those with a disability), provide sanitary facilities, and meet fire safety requirements.
What are the classes of erector or supervisor of temporary structures?
The classes of erector or supervisor of temporary structures are:
Temporary Structures (limited to scaffolding, stages, and towers)
Temporary Structures (limited to tents and marquees)
Temporary structures (limited to scaffolding stages and towers)
People registered in this class are responsible for erecting and dismantling stages, seating stands, equipment platforms and towers fabricated on-site from tubes and fittings or other scaffolding components of metal and other materials.
Temporary structures (limited to tents and marquees)
People registered in this class are responsible for erecting and dismantling tents and marquees.
What do registered practitioners need to know and do?
A registered Temporary Structures (limited to scaffolding, stages, and towers) practitioner must have capacity to undertake or supervise the following activities in a competent manner and to a professional standard:
apply knowledge of the Australian Building Codes Board Temporary Structures Standard 2015
apply structural provisions to the erection of temporary structures
apply structural provisions to the erection, maintenance and dismantling of seating stands
comply with occupancy permits
demonstrate an understanding of the principles of Alternative Methods (see the ABCB Temporary Structures Standard 2015) and their application in the design, implementation and use of temporary structures
erect and dismantle safety barriers
erect temporary structures (scaffolding stages and towers) according to design specifications/requirements
erect, maintain and dismantle all types of equipment platform and tower erected on site using components specified in the design and in any relevant permits
erect, maintain and dismantle stands and platforms, including sky borders and stage wings
establish appropriate contracts to do the work
identify site and task related hazards and develop risk control strategies
maintain relevant insurance cover as a registered building practitioner
prepare, implement, and review Safe Work Method Statements (SWMSs)
produce cost estimates and quotes for the work
read and interpret architectural and engineering designs/drawings.
A registered Temporary Structures (limited to tents and marquees) practitioner must have capacity to undertake or supervise the following activities in a competent manner and to a professional standard:
apply knowledge of the Australian Building Codes Board Temporary Structures Standard 2015
apply onsite risk management or risk monitoring when planning, erecting and using temporary structures
comply with occupancy permits
erect and dismantle safety barriers
erect temporary structures (tents and marquees) according to design specifications
establish appropriate contracts to undertake the work
maintain relevant insurance cover as a registered building practitioner
produce cost estimates and quotes for the work
read and interpret architectural and engineering designs/drawings.
What knowledge do you need to demonstrate?
Temporary Structures (limited to scaffolding, stages, and towers)
The successful completion of the unit of competency Identify construction work hazards and select risk control strategies (CPCCWHS3001 or CPCWHS3001) or
An intermediate scaffolding licence issued under the Occupational Health and Safety Regulations 2017.
Temporary Structures (limited to tents and marquees)
The successful completion of the unit of competency Identify construction work hazards and select risk control strategies (CPCCWHS3001 or CPCWHS3001).
What experience do you need to demonstrate?
For registration in Temporary Structures (limited to scaffolding, stages, and towers)
You must have 2 years of practical experience to the satisfaction of the BPC in the erection, maintenance and dismantling of stages, seating stands, equipment towers and platforms fabricated on site.
You must also be able to demonstrate experience in erecting and dismantling at least 5 prescribed temporary structures, including:
2 seating stands for more than 20 people
2 stages or platforms more than 150 m2 in floor area.
For registration in Temporary structures (limited to tents and marquees)
You must have 2 years of practical experience to the satisfaction of the BPC in the erection, maintenance and dismantling of tents and marquees. You must also be able to demonstrate experience in:
erecting at least 5 tents or marquees with a floor area greater than 100 m2
erecting 2 marquees on seating stands and/or scaffold structures.